Lexos Mill
Published on
08-06-2018
Characteristics
Installed turbine | T1300 |
Installed power | 36 kW |
Flow rate equipped | 2,35 m3/s |
Head height | 2,00 m |
Location | Aveyron |
Project completed in June 2018. Uses a T1300 Turbine coupled to a turbiboard electrical cabinet, to exploit the dam’s attraction flow.