Lexos Mill

Published on 08-06-2018

Characteristics

Installed turbineT1300
Installed power36 kW
Flow rate equipped2,35 m3/s
Head height2,00 m
LocationAveyron

Project completed in June 2018. Uses a T1300 Turbine coupled to a turbiboard electrical cabinet, to exploit the dam’s attraction flow.